On 26th October, 2017, the Bukaka team visited Tolian for further negotiation and technical communication of the equipment supply contract.
On 24th October, 2017, the 900t Full Span Launching Gantry for MBEC successfully finished the first placing of 900t concrete box girder in the jobsite of Qufu in Lunan Highspeed...
The first set of LG1250 Segmental Launching Gantry will soon be dispatched to Thailand for the construction of Motorway Route No.6. ...
The second set of LG550 Segmental Launching Gantry for Thailand Motorway Route No.6 left Tianjin Seaport on 15th October, 2017.
The 140t Scrap Basket Transporter sucessfully passed the FAT in Qinhuangdao Manufacturing Base and be ready for shipping.
On 14th October, 2017, the Modular Transporter designed and manufactured by Tolian for the Beijing Aerospace is fully tested and be ready for action. ...
On 11th October, 2017, the LG1250t Segmental Launching Gantry for ThailandMotorway Route No.6 Bang Pa-In to Nakhon Ratchasima Section 10, 11, 12 sucessfully passed Factory Accep...
The 2700t span by span launching gantry designed by Tolian for Pingtan Bridge has finished the erection task and started assembly on 10th October, 2017. ...
On 23rd September, 2017, the president of China Huajian Group Mr. HE visited Tolian. Mr. Wei Wang, the president of Tolian Group, and Mr. Jinxiang Wang, the General Manager of T...
On 20th September, 2017, the officers from Thailand Department of Highway visited the jobsite of LG700 in Motorway 6. Tolian made Segmental Launching Gantry?won highly praise fr...
Copyright ? Qinhuangdao Tianye Tolian Heavy Industry & Technology Co., Ltd.
備案號(hào):冀ICP備16020782號(hào)-1
冀公網(wǎng)安備 13030502000240號(hào)
Tel: 0335 - 5302568